Tacoma residential permits, approved faster.
We know how the City's Planning and Development Services handles residential projects, from quick alteration reviews to full plan review, so your remodel, addition, deck or ADU gets to approval with less back and forth.
- Permit specialists who know local code and zoning
- We prepare and submit your application through the City's permit portal
- In-house permit drawings at a fraction of traditional firm costs
- Free revisions until your permit is approved
Call today: (206) 312-2992
Evergreen Permits is a private residential permit service, not part of the City of Tacoma or any government agency.
Tacoma's permit specialists
Evergreen Permits is a team of architectural designers and permit specialists helping Tacoma homeowners, contractors and architects. We do one thing exceptionally well: permits. No upsells, no construction services, just permits done right.
200+
Projects completed
5.0
Star Google rating
10+
Years experience
99%
Approval success rate
What do Tacoma homeowners worry about most when getting a permit?
We hear the same three questions on almost every project. Here are straight answers.
How long will this take?
The City reports a median first review of 1.9 weeks for residential alterations, against a 3-week target, and 3.6 weeks for new homes. Timing depends on scope and on how quickly corrections come back, so we send a complete package the first time to keep you to as few rounds as possible.
See review times →Will the City send my plans back?
The City reports an average of 1.4 review cycles for residential alterations and 3.0 for new homes. We file complete drawings, answer every comment and revise for free until you're approved.
See what the City looks at →How much are permit fees?
The City builds your fee from your project's valuation, adds a plan review fee and a technology fee, and bills extra plan review for revisions by the hour. We walk you through what applies to you before you commit to anything.
Estimate your permit fees →How does Evergreen Permits make permitting easier?
Tacoma has its own review process, its own portal and its own utility permits. Here is how we take the weight off your shoulders.
- We confirm who has jurisdiction first, because a Tacoma mailing address doesn't always mean the City of Tacoma permits your property.
- We prepare a complete submittal, with a scaled site plan and the right permit types, so review goes through the first time.
- We answer every comment and revise for free until your permit is approved.
Consult
A free call to scope your project and flag what the City will require.
We prepare
Jurisdiction and zoning checks, plus permit-ready drawings in-house.
Submit & manage
We submit through the City's portal and respond to every review comment.
Get approved
Free revisions until your permit is issued, and support through inspections.
What can Evergreen Permits help you permit in Tacoma?
From a kitchen remodel to a backyard cottage, we prepare the drawings, submit through the City's portal and manage every review round until you're approved.
What are the building permit requirements in Tacoma?
What the City looks at on a residential permit, and the items that most often shape a project's scope, timeline and cost.
Apply through the City's portal
Tacoma takes applications and fee payments through its Accela-based permit portal, Tacoma Permits. Select residential permits can be submitted online as ePermits.
Residential combination review
Residential projects with six or fewer dwellings and three stories or less are generally handled through the residential combination process. Larger or taller projects go to commercial review.
Review comments and revisions
The portal shows each required review as completed, in progress or pending. When corrections are needed, the City issues a Review Comment Memo, and you resubmit revisions before the permit is issued.
Site plan & drawings
Plans must be clear, scaled electronic files. A complete set typically includes a site plan, floor plans and elevations, and structural calculations from a licensed engineer where the work requires them.
ADUs
Tacoma allows ADUs with living area up to 1,000 square feet. Detached units go in the rear yard with a 5-foot side setback and a 15-foot rear setback (none from an alley), and no extra parking is required.
Grading and site work
Minor grading and paving on a residential lot fall under the building permit. Proposing more than 50 cubic yards of cut or fill requires a separate Site Development permit.
Electrical comes from the utility
Electrical permits are separate and are obtained from Tacoma Public Utilities rather than through the building permit, so plan for that step early.
Trade and utility permits
We prepare the main building permit. Depending on scope, a project may also need plumbing, mechanical, side sewer, stormwater or water permits, and we flag them up front.
Who handles building permits in Tacoma, and how long does it take?
Who issues it
Planning & Development Services
City of Tacoma PDS, 747 Market Street, 3rd Floor. Walk-in lobby open 9 am to 1 pm, Monday to Thursday. Phone: 253-591-5030.
Residential permits →Review time
About 2 weeks for alterations
The City's median first review is 1.9 weeks for residential alterations (3-week target) and 3.6 weeks for new homes (4-week target).
Review and track permits →Watch for
The 180-day clock
If the City asks for action and you don't respond within 180 days, the permit is cancelled. An issued permit also expires if work hasn't begun within 180 days.
What the City looks at →City fees
It depends
Valuation-based permit fee, plus plan review and a technology fee.
Cost breakdown →Sources: City of Tacoma Planning and Development Services. Review times are the City's published medians and targets for first reviews, and your project may take more or less time depending on scope and how quickly corrections are returned. Figures reviewed November 2026.
A Tacoma project, in detail

Whole-house remodel · Tacoma
Bringing a boarded-up house back to a permit
The owner of this 1,079-square-foot Tacoma house wanted a full remodel: a new kitchen and bathroom, new plumbing and electrical, drywall, windows and doors, plus a small addition. Work had already started and the City had issued a stop-work order, and the property has an on-site septic system. The owner called us in to resolve the order and find the right permit path.
Our role: resolving the stop-work order with the City by documenting the existing work, a feasibility study, routing with the health department for the septic system, an existing-conditions site plan, the permit drawings and the online application. Photo: the house before work began.

What the City asked for
One round of comments, answered in four days
Building review. The City's first review came back with 11 items. They included a continuous foundation for Seismic Design Category D, an engineering evaluation of the framing loads, a roof framing plan, energy credits, egress and smoke and carbon monoxide alarms. A licensed engineer stamped the structural sheets and calculations, and we folded them into the set.
Utility pole. Tacoma Power flagged the addition's clearance to a nearby pole. We showed that the addition sits outside the required 4-foot clearance zone and added the pole and its dimensions to the site plan.
The result. We returned every response on May 26, four days after the comments arrived, and the City issued the permit on July 8, 2026.
Photo: the house as construction got under way, with new foundation forms.
What do clients say about Evergreen Permits?
Real reviews behind our 5-star Google rating.
“I hired Evergreen Permits to help with the permitting process for my home renovation. They handled the paperwork and guided me through the city requirements, which made the whole process much easier…”
Read full review on Google →“Sara was our main point of contact and was absolutely amazing throughout the entire process. She guided us through multiple permit applications across various projects, always staying accessible and proactive in her communication…”
Read full review on Google →“I am a general contractor and we work with Evergreen on all of our projects. They take great care of our clients, do an excellent job and have very clear communication. We recommend them to everyone!”
Read full review on Google →Why do Tacoma homeowners choose Evergreen Permits?
We built Evergreen Permits around a simple idea: residential permitting should be easier to understand and more affordable to navigate. Here is what that looks like in practice.
Permit specialists in Tacoma
Our team specializes in permit assistance in Tacoma. A project coordinator manages everything for you, so you do not have to worry about a thing.
Free revisions until approval
We support you through every correction and resubmittal, and revisions are free until your permit is approved.
Permits are all we do
No construction services and no upsells. Our only job is getting your permit approved.
Drawings done in-house
Permit-ready drawings and site plans from our own team, at a fraction of the cost of traditional firms.
Simple for you
We guide you through scanning your home with a simple app, then verify every detail remotely, so there is no site visit to schedule.
A track record you can check
200+ projects, 10+ years of experience, a 99% approval success rate and a 5.0 Google rating.
Where are you in your project?
Pick the step that fits. You will leave each one with a clearer picture of what to expect.
Just exploring
Check whether you need a permit
Answer a few questions about your project and see what the City will likely require.
Do I Need a Permit?Planning a budget
Get a fee range in seconds
Enter your ZIP code and project type to see a planning range for your city permit fees.
Try the Permit Cost CalculatorReady to move
Talk to a permit specialist
It is a free consultation. You will leave with an honest picture of what permitting will involve before you commit to anything.
Call (206) 312-2992
Or Book a Free ConsultationHow much does a building permit cost in Tacoma?
For remodels and additions, the City's permit fee is 2.81% of your project's valuation (with a $180 minimum for remodels), plus a plan review fee of 45% of the permit fee and a 5% technology fee. Extra plan review for revisions is billed at $180 per hour, so a complete first submittal saves money.
Get a fee estimate for your project
Our free Permit Cost Calculator gives you a planning range in seconds. Enter your ZIP code and project type.
Fee rules are as published in the City of Tacoma PDS Fee Schedule effective January 1, 2025, the most recent schedule we could confirm, and the City may have updated its rates since. Only the City sets your final fee, which depends on your valuation, scope and any additional reviews. City fees are separate from professional fees for drawings and permit management. Sources: City of Tacoma PDS Fee Schedule and the City's fee estimator.
Do I need a building permit in Tacoma?
One-story detached accessory structures up to 200 sq ft, fences up to 7 feet, retaining walls up to 4 feet, decks up to 200 sq ft and 30 inches above grade that aren't attached to the house, and finish work like paint, tile and cabinets don't need a permit. Most structural work, additions and ADUs do. See the City's list of work exempt from a residential permit.
Not sure if your project needs a permit?
Answer a few questions and our free tool will tell you what to expect before you commit to anything.
Tacoma permit questions, answered
How long does a Tacoma building permit take?
The City publishes median first-review times: 1.9 weeks for residential alterations (against a 3-week target) and 3.6 weeks for new residential buildings (against a 4-week target). Residential alterations average 1.4 review cycles and new buildings average 3.0. Actual times vary with the permit type, how complete your application is and how complex the project is. We send a complete package the first time and handle every correction.
Can I build an ADU or DADU in Tacoma?
Often, yes. Tacoma allows ADUs on legally established lots, with living area up to 1,000 square feet. A detached ADU goes in the rear yard, with a 5-foot side setback (8 feet if the main entrance faces the side line) and a 15-foot rear setback, and no setback from an alley. The City doesn't require extra parking for an ADU, and the lot must keep at least 10% of its area as usable open space. The City also offers pre-approved detached ADU plans, though site-specific review is still required. A feasibility study confirms what your lot can support before you pay for full drawings.
Do I need a permit for a fence or a deck in Tacoma?
Fences up to 7 feet high don't need a building permit. A deck is exempt only if it's no more than 200 square feet, no more than 30 inches above grade at any point, not attached to the house and not serving the exit door. Anything larger, higher or attached needs a permit. Exempt work still has to follow zoning and setback rules, so check before you build.
Do I need a separate electrical permit in Tacoma?
Yes. Electrical permits are separate from the building permit and are obtained from Tacoma Public Utilities. Plumbing and mechanical work can need their own permits too, depending on the scope. We tell you which permits your project needs at the start, so nothing surprises you mid-build.
Is my property in Tacoma or Pierce County?
A Tacoma mailing address doesn't guarantee that the City of Tacoma permits your property. Some addresses with a Tacoma mailing address are in neighboring cities or in unincorporated Pierce County, where different rules and a different permitting office apply. We confirm jurisdiction first, so you apply in the right place.
Why use a permit service instead of my contractor or doing it myself?
Permits are the only thing we do, so we know what the City asks for and how to answer corrections. Our team specializes in permits, a project coordinator manages everything for you, our drawings are done in-house at a fraction of traditional firm cost, and revisions are free until approval. You stay in control, and your contractor can build from the approved permit.
Do you provide the drawings, or just the paperwork?
Both. Our in-house team produces permit drawings and site plans when your project needs them, and manages the full submission and approval process, so you don't need to coordinate with a separate draftsperson.
Do you work in my Tacoma neighborhood?
Yes, we serve every part of Tacoma as well as surrounding cities across Pierce County.
Also serving nearby
- Federal Way
- Kent
- University Place
- Lakewood
- Fircrest
- Fife
- Puyallup

Ready to get your permit approved faster?
Tell us about your project and we'll tell you exactly what the City will require, what it will cost and how the review should go.